LIFT AND SHIFT!

by

Andrew Beaman

22 July 2019 at 11:09

QARC Systems details the Autodesk REVIT procedure for using phases to lift and relocate a building on a site.

In Australia and particularly Queensland, Building Designers are often called upon to demolish lower sections of buildings (lower structure), lift buildings and relocate them on sites.

In Autodesk Revit, this can be a difficult procedure. Understanding what has to be demolished and when, and how the correct documentation can be achieved is a complex problem.

QARC Systems has created a detailed explanation on what phases to set up and how exactly to go about demolishing sections of buildings. The virtual building can now be settled at the new level and position on site.

Click on this link to download a pdf showing how this procedure is achieved.

Download the QARC4Revit plugin to access content directly from the drag and drop browser in the REVIT project. QARC Systems – Master Revit faster!

Author

Andrew Beaman,

QARC Operations Manager

Believing that being prepared will always give you the best opportunity to succeed, Andrew has embraced everything Autodesk and BIM technology has offered to deliver the ultimate springboard for Revit users. He is currently the Operations Manager for QARC Systems, bringing his advanced knowledge of Revit to pair with his considerable history of Sales and Marketing experience.

Join the conversation

Leave a Reply

Your email address will not be published. Required fields are marked *